Project Features
Completion: 2008
Replacement of six expansion joints on the bridge structure over Burlington Bay near Niagara.
Type of Structure: Highway bridge, 2.5 km (8,202 ft.) long
General Contractor: Concreate USL Ltd
Consulting Engineers: McCormick Rankin Corporation
Owner: Ontario Ministry of Transportation
Products and Services
Goodco Z-Tech
- 4 LG-6 modular joints (86 m/282 ft. total)
- 2 LG-4 modular joints (43 m/141 ft. total)
Highlights of the Project
- First modular joint design-to-construction project for the Ontario Ministry of Transportation
- Extremely complex joints with a significant amount of complete penetration welding
- All joints were delivered as a single 21.5 meter-long (70.5-ft.) section by Canam Group’s truck fleet