Project Features
Completion: 2009
Construction of a new railway bridge across the Red River Floodway in Winnipeg, MB.
Type of Structure: Railway bridge, 305 m (1,000 ft.) long - 13 spans
General Contractor: M.D. Steele Construction Ltd.
Consulting Engineers: Earth Tech (Aecom)
Owner: CP Rail
Products and Services
Structal-Bridges
- Fabrication of the steel structure of the bridge, including 78 main girders (1,550 tons)
- Longest girder: 24.3 m (78 ft.)
Goodco Z-Tech
- 78 multidirectional self-lubricating spherical bronze bearings
- 78 unidirectional self-lubricating spherical bronze bearings
- Total weight: 160 tons
Highlights of the Project
- Goodco Z-Tech’s largest spherical bearing project
Manufacturing Plants
- Quebec City, QC
- Claremont, NH
- Laval, QC
|