Project Features
Completion: 2009
Reconstruction of the southern structure of the Galipeault Bridge on Highway 20, between Île-Perrot and Montreal (above the Outaouais River).
Type of Structure: Steel highway bridge, 500 m (1,640 ft.) long
General Contractor: Pomerleau-EBC Coentreprise
Consulting Engineers: SNC-Lavalin/Dessau
Owner: Transport Quebec
Products and Services
Goodco Z-Tech
- 26 laminated elastomeric bearings with upper plates beveled for the footbridge
- 68 pot bearings (elastomeric): 50 multidirectional bearings (PM) and 18 unidirectional bearings (PMG)
- 1 HSS-type MTQ joint with a seal (19 m/62 ft.)
- 2 LG-2 modular joints with 2 seals (38 m/125 ft. total)
Highlights of the Project
- Seismic fuses integrated into pot bearings
Manufacturing Plant
|